How is the butt weld flange assembled with the pipe?

The pipe mat is laid flat, the nozzle is aligned with the flange neck, the gap is found, and the spot welding is a little. Based on this point, the short side of the square is placed on the tight flange sealing surface, and the long side and the flange thickness are tightly attached. Use a tape measure to measure the distance between the two points on the long side and the centerline of the tube.
How is the butt weld flange assembled with the pipe?

The pipe mat is laid flat, the nozzle is aligned with the flange neck, the gap is found, and the spot welding is a little. Based on this point, the short side of the square is placed on the tight flange sealing surface, and the long side and the flange thickness are tightly attached. Use a tape measure to measure the distance between the two points on the long side and the centerline of the tube. If they are equal, the spot welds corresponding to the points that have been ordered are dead. Start at this point and turn 90° along the circumference of the flange. Use the above method to find the right point, evenly point four points, and the flange is finished.

Straight pipe ends have flanges, and the two flanges are aligned.

First place the tube flat, use the level to find the center line of the tube, and mark the nozzles at both ends. Use a square to find the center line of the corresponding eye on the high neck and flange sealing surface and mark it. Pass the long side of the square from the flange hole, the long edge is close to the inner wall of the flange hole, the short side is aligned with the mark, and the sealing surface is pressed tightly. A little bit is drawn on the groove of the flange neck, and the point is aligned with the pipe. The mark on the port, the two flange eyes are aligned on the pipe.



Article source: http://
Http://news.chinawj.com.cn Editor: (Hardware Business Network Information Center) http://news.chinawj.com.cn

High Polymer self-adhesive film waterproofing roll material  is  one kind multi-Iayer composite waterproof material with superior performance ,  including one layer high density polyethylene (HDPE) membrane ,  one layer high polymer self-adhesive film and one reaction sand or isolation membrane layer go through specially treated. And it has self-healing function ,  after reaction and consolidation with concrete slurry ,  forming a  waterproof  layer to gapless combined with concrete structure ,  eradicating water breakthrough, efectively improving the reliability of waterproofing system.

NCL  HIGH POLYMER SELF-ADHESIVE FILM WATERPROOFING  ROLL  MATERIAL

NCL

HIGH POLYMER SELF-ADHESIVE RUBBER ASPHALT WATERPROOFING  ROLL  MATERIAL

NCL film

HIGH POLYMER SELF-ADHESIVE  BACK-LINER RUBBER ASPHALT  WATERPROOFING  ROLL  MATERIAL

back-liner

Executive Standard:

GB/T 23457-2009  GB/T23260-2009


Specification:

Width:2m Thickness: 1.2mm ,  1.5mm , 2.0mm. 
Length: 20-30m (Can  be  customized according  to  user needs)


Application:

Various  underground  caves ,  tunnels ,  subways ,  bridges ,basements ,  water  conservancy  dams ,  landfills ,  sewage treatment pond, municipal construction and other waterproofing anti-seepage projects.

NCL application

High Polymer Self-Adhesive Film Waterproofing Material

High Polymer Self-Adhesive Film Waterproofing Material,Waterproof Roll Material,Polymer Self-Adhesive Waterproof Material,Polymer Self-Adhesive Waterproof Membrane

Shandong Tianhai New Materials Engineering Co., Ltd , https://www.chinatinhy.com