Digging out the "dead corner" bathroom construction problems that cannot be ignored

Almost every family that has completed the renovation will have some regrets, either because it is not well thought out when designing, or because of negligence, it leaves a "sequel." Especially in the humble place of the bathroom, it is more difficult at home, decoration design, sanitary ware selection, construction quality, which can not be vague, as long as you pay little attention will leave "dead ends" for future use. Add trouble. The "dead ends" mentioned here mainly refer to the following three aspects:


Silver Crystal Bathroom Cabinet      JOYOU Zhongyu bathroom

First, it is not considerate before buying, and it is neither beautiful nor practical after purchase.

Generally speaking, the cost of purchasing only sanitary ware may account for about 1/8 of the total amount of decoration. Due to the variety of tricks, the price varies greatly from a few hundred dollars to a dozen or so ten thousand yuan. When purchasing, they often take a short look. After buying a home, they find that they are not in harmony with their own bathroom.

Therefore, it is best to consider what kind of products to buy in the design stage. During the construction, you can reserve space, change the piping, and create installation conditions according to the specific installation requirements and technical parameters of the purchased products to ensure that the decoration process can be successfully completed. Bathroom products can be installed and used normally.

Under normal circumstances, the decoration company will draw the decoration design drawings for the owners, including the overall renderings, detailed construction drawings and water circuit transformation plans. However, due to inadequate communication between the owner and the designer in advance, the owners were not conscientious enough to make suggestions for modification of the original design as the construction proceeded. As a result, the construction of the concealed works, such as the renovation of the water circuit, was found to be unobstructed. , leaving hidden dangers for subsequent construction.

When there are water circuits in the bathroom room that need to be remodeled, you should ask for a circuit renovation plan in advance. If there are changes in the construction process, you have to communicate with the designers of the hydropower reform to draw a transformation plan, and then start construction. Do not modify it while constructing, so as not to injure electric wires and cause disasters when constructing the wall in the future.

This situation is more common in the bathroom. If the socket on the wall is fixed, it is found that the height of the ceiling is in direct conflict with it. However, it is difficult to change the ceramic tile. Also, if the washbasin is in place, it can be found that the pipeline cannot pass normally, and only a few bends can be taken out from there.

Before buying sanitary products, everyone must consider whether existing design solutions and future construction are feasible and flexible. As the faucet needs to be embedded with a suitable water supply pipe, the bathroom cabinet requires sufficient space for installation. The toilet wall needs to take into account the wall distance. The load-bearing wall and floor drain location need to be considered. These conditions must be met during home improvement. , otherwise sanitary products can not be installed and used.

Bathroom Construction Acceptance Notice Space Bathroom Decoration Design Home Decoration Socket Decoration Ceiling Renderings Decoration Finding Decoration Company Okay Bathroom Decoration Design Bathroom Decoration Rendering Bathroom Tile Bathroom Design Bathroom Ceiling Bathroom Wash Basin Integral Toilet Bathroom Design Tile Price ld Tile

Gutter Vacuum Pole

Gutter Vacuum Pole,Gutter Vacuum ,Gutter Cleaning Vacuum ,Gutter Cleaning Tools

Telescopic pole Co., Ltd. , http://www.sailingpipingmaterials.com