Home improvement details did not worry about summer decoration

The hot summer is coming. Are you preparing to make a new face for your home? Whether it is the renovation of new homes or the renovation of second-hand houses. In the home decoration, will always involve some decoration knowledge and decoration notes, the following by the small series to introduce you to the summer decoration process, what are the precautions? Allows you to be more comfortable in the decoration, put on a beautiful and practical home.


Jumei Indian Home Furnishing Museum      Meihao Home Accessories Museum  

First, material preservation is necessary not to leave home hidden dangers

Summer is a hot, sunny and rainy season. In the process of renovation, the preservation of materials is indispensable. Due to the hot weather in summer, the building materials that are renovated tend to be dry, cracked, and deformed. In the summer of renovation, how should we preserve the decoration materials?

1, paint paint must pay attention to explosion-proof

Paints and paints are flammable materials. Although they are not used in the renovation of homes, they should also pay attention to safety. Many fires during renovations are caused by improper preservation of paint. Therefore, the paint has a great deal of attention. General paint should be stored in a cool and ventilated place, and the storage container must have good sealing. Also pay attention to keep away from open flames and wire sockets so as not to produce spark ignition paint. It is usually recommended that the purchased paint be used within one month.

2, wallpaper must pay attention to loss of water

Wallpaper is an indispensable building material for wall decoration. Its beauty and variety of designs have received consumers' favor. But the wallpaper is very fragile. Because the material of the wallpaper is paper, it is easily affected by the weather in the summer, dehydration and drying of the wallpaper, and the paper becomes hard and brittle, which is not conducive to paving. Therefore, wallpapers must be properly preserved before they are used. It is generally recommended to place the wallpaper in a well-conditioned, shaded place with a moderate humidity. If the wallpaper has already been used, it must be packed in plastic bags and then stored.

3, cement must pay attention to moisture

In the decoration process, the use of cement is the most. In rainy summer, cement is prone to moisture. After the damp cement condenses into pieces, it cannot be used. This caused a waste of material. When you save cement, be careful not to place the cement directly on the ground. You can first lime the floor, put a block of wood or a tree, and then put the cement. The space for storage should be well controlled and the stacking site should be dry so as to effectively prevent the cement from getting damp.

4, the board must pay attention to fire and deformation

In summer, the weather is dry and hot. Because the moisture content of wood changes with the climate, the stored plates are easily deformed. In addition, the hot and hot weather makes it easy to burn the plates and pose safety hazards for the decoration. In hot weather, the preservation of plates is very important. The storage point should not be exposed to sunlight. It must have a certain distance from the outlet and the open flame and be well ventilated. And the plate storage point must not store too much decoration materials, especially paints, wires and other flammable and explosive items.

Second, the decoration environment must be carefully selected for construction safety rely on it

The decoration environment has a certain influence on the quality of the construction. During the renovation process, we should pay attention to the choice of the decoration environment, including the temperature, humidity and ventilation of the environment. Strive to make home decoration in a reasonable and safe environment.

1, decoration of the optimum temperature and humidity

Hot weather in summer, high indoor temperature is not good for the preservation of materials and decoration construction process. Therefore, the optimum temperature for decoration should be 21-32°C, and the optimum humidity is generally 30-65%. Guaranteeing indoor temperature and humidity is conducive to construction safety.

2, decoration environment to be ventilated

In summer, the temperature is high and the climate is dry. From the point of view of safety, it is necessary to minimize the excessive decoration materials on the construction site to avoid the fire caused by the non-circulation of internal air and high temperature, and to avoid the decoration pollution. Allow the room to be ventilated as much as conditions permit, or use indoor ventilators and air purifiers that reduce harmful gases in the room.

3, the construction site to secure access to electricity

The safe use of electricity in the construction process is an important guarantee that the project can be completed on time, by quality and by quantity. Temporary power equipment for renovation should be protected. Protection of ground and protection of zero lines is strictly prohibited. In addition, no temporary accumulation of foreign matter may occur on the surface of the electricity used to prevent heavy objects or abandoned building materials from crushing the electric wires. Temporary sockets must be elevated with tools such as ladders to prevent them from being crushed by heavy objects.

4, the construction point away from the open flame

Summer itself is very dry. The whole environment is like being grilled and it is easy to cause fire. Therefore, don't "ignite yourself" in summer decoration. According to national regulations, open fires cannot be used at the construction site. Workers cannot smoke on the scene, nor can they cook on open fire. If you need to use a welding process must advance to the property and other places for the record.

Third, the details of home improvement did not worry about the summer decoration

Into the hot summer, the summer's unique temperature and humidity, easy to make a series of problems with home decoration. Therefore, there are relatively more details and problems to be noted in the details of home improvement. Which decoration details must pay attention to the summer decoration?

1, the putty must be extended dry time

Brush the putty before you paint the wall. Usually you need to scrape 1-3 times. The normal dry time is 1-2 days. In the summer decoration, as long as possible to extend the putty dry time, generally 2-3 days is appropriate. Because the weather is hot and wet in the summer, especially when the typhoon rain comes, putty drying time will increase. In addition, when hanging putty, you should use the cadres to wipe the wall of the water vapor clean, try to keep the walls dry and conducive to the wall paint and paving wallpaper.

2, before the wallpaper is laid, it must be soaked in water

In summer decoration, wallpaper and wall cloth must be fully immersed in water before paving. Do not think that you can not use a wet cloth is to keep dry, in fact, wallpaper also need to pay water, but this method of replenishment before the paste, you can first soak the wallpaper in warm water for seven or eight minutes, dry and paste.

3, paving tiles to increase the amount of water

In summer, the temperature is high and the water evaporates too quickly. If the water is not used properly, the tiles will easily fall off after the tiles are laid. In tile construction in summer, the amount of water used should be slightly higher than that of other seasons. If you do the water according to the ratio of the ordinary decoration, then the amount of water will be significantly less, it is prone to construction quality problems caused by too fast after the tile laying.

4, wood floor joints to reduce

In midsummer, the laying seams of the floor paving should follow the following principles: First, a 15 mm gap should be left between the door and the ground; secondly, the expansion joints reserved for wall roots, door trim strip interfaces, etc. should be greater than 8 mm. In particular, laying floors in the summer, leaving the seams can be reduced appropriately to avoid hot weather, there is not enough room for floor expansion when the floor heat rises.

Fourth, renovation and logistics maintenance to keep home like new

In summer, rainy days and exposure days are always separated, so after the renovation of the maintenance is even more important, good maintenance can make the quality of the decoration better protection, the following are several points of decoration and maintenance.

1, the wall should not be exposed

Summer temperatures are high and the sun is fierce. If the wall after brushing is often exposed to sunlight, the color of the wall will easily fall off and the white wall will turn yellow. Therefore, we must try to avoid exposure to the wall after painting.

2, to avoid wallpaper "drenched"

After the wallpaper is applied, it will take a while to dry. If you open the windows and doors at this time, let the freshly-laid wallpaper be “drenched” and the wallpaper will shrink due to rapid loss of water. Therefore, avoid direct “drenched” wallpapers that have just been paved.

3, after the installation of floor tiles to install springboard protection

Since there are often typhoon rains in the summer, after paving the floor tiles, if it rains consecutively, it will affect the drying speed of the cement. If the cement is not fully dry, it will be trampled directly on it, and the floor tile cement layer will easily be unevenly distributed and empty drum phenomenon will occur. Therefore, after paving the floor tiles, you cannot step on them immediately, and you should set up a springboard to make it easy to pass.

4, let the floor "rest" 1-2 days

In the renovation project, many people hope that the progress of the project can be made faster and that they will finish their stay as soon as possible. In fact, this is a misunderstanding. Wood floor experts believe that in summer construction, after each small project is completed, it is necessary to “rest” for 1 to 2 days, which is very necessary to ensure the quality of the project. Finally, within 48 hours after the laying of the wooden floor, the owner should try to avoid walking or placing heavy objects on the wooden floor, leaving enough time for the glue on the floor.

Summer decoration knowledge entrance decoration children's room decoration wallpaper cement home paint coating floor tile home wallpaper home improvement home home accessories tile adhesive ld tile floor tile decoration home

Product introduction
HHCMS-220 Carbon Molecular Sieve
The HHCMS-220 is a new nonpolar adsorbent designed to extract nitrogen-rich gas from air. It is suitable for separating nitrogen from air. It has a high adsorption capacity for oxygen and can separate nitrogen from air.
The most notable features of the carbon molecular sieve are high gas-producing efficiency and low energy consumption, especially for the preparation of nitrogen with a purity of less than 99.5% to 99.9%.

It is widely used in large air separation nitrogen equipment, and its application fields include coal mine, ship, oil storage and transportation.


Project parameters

Project parameters
The diameter of:1.0-1.3   1.3-1.5
Packing density:≥660kg/m³
The intensity of particle:≥95
Compressive strength abrasion:≤1%
The moisture content:≤0.5%
Standard packing:20Kg/barrel. 40Kg/barrel. 130Kg/barrel


The adsorption time of test condition was 58s with an average pressure of 1-2s

Adsorption pressure

Nitrogen purity (%)

 Yield (Nm3/ h.t.)

Nitrogen recovery rate

 

 

 

0.8MPa

99.99

80

23

99.9

150

30

99.5

220

36

99

310

42

98

370

45

97

450

47

96

520

50

95

580

55

 

 

0.6MPa

99.99

64

24

99.9

110

32

99.5

180

37

99

245

43

98

300

46

97

360

48

96

410

52

95

465

56


Pay attention to
1. The nitrogen production equipment can reduce the adsorption temperature to better show its excellent nitrogen production performance under conditions;
2. Pay attention to low temperature drying and seal preservation during storage;

Molecular Sieves Hhcms-220

Molecular Sieves Hhcms-220,Molecular Sieve Dehydration,Molecular Sieve Activation,Hhcms Molecular Sieve

Zhejiang Changxing Haihua Chemical Co.,Ltd. , http://www.zjcxhhcms.com