Renovation process steps eight major decoration matters needing attention

I believe that many people are still confused when they purchase a new house. They don’t know where to start and face the steps and processes of home decoration. Xiaobian will explain it to you today. I hope to bring you some help, but also to share with you about the steps of the family decoration process steps , in case of need.

Decoration process steps

1. Demolition and reconstruction of the main body

The demolition of the main body is the first one to be put on the project. It mainly includes the demolition of walls, walls, shovels, removal of heat, replacement of steel windows, and so on. The garbage that has been demolished must be cleared out in time to ensure the cleanliness of the interior and it is also more convenient for future construction.

2, hydropower reform

Before the hydropower reform, the cabinet designer should come to the door to make the first measurement, help determine the exact location of switches, lamps, basins, bathtubs, washing machines, etc., and formulate reconstruction plans. The water heater is also best to send people, according to your choice of model, design a good power, interface location. The air-conditioning and its power supply should be placed on the wall of the bedside as much as possible to avoid direct air-conditioning to the person.

3, wallpaper

The wallpaper is much better than the wall paint effect. After the wall paint is brushed, the oil trader will brush nitro-lacquer on the place where the wallpaper is to be applied, and the paint will dry out the next day. Then you can paste the wallpaper.

4, install the socket panel

The socket panel can be installed for about half a day. It should be noted that the socket is best bought with the switch function, especially the kitchen. In this way, the rice cooker and the microwave oven can avoid plugging and unplugging the power and can be controlled by the switch.

5, install the cabinet

Cabinets are a cooperating project and should be purchased in advance for range hoods, cooktops and sinks. It is best to send it on the same day and install it with the cabinet.

6, install the finished product door

Finished doors should be installed before the floor. Mainly because of the complex installation steps, hinges, door locks, door stoppers, door frames, and so on, many tools are used, such as installing the floor first, and the bumps are difficult to avoid.

7, install the hardware

It is recommended that before the installation of the floor, the debris items that are scattered in the drying racks, curtain rods, lamps, sanitary ware, and sanitary ware should be installed one by one. If the procedures are reversed, it may cause damage to the floor.

8, install the floor

Before the floor is installed, it must be leveled. Workers must be required not to cut the floor in the house. They should be cut in the corridor so that they can clean the corridor.

In addition, there are many late accessories, such as curtain decorations and the like, these can basically be based on space and design style. These are only a rough order of home improvement, sometimes due to changes in the people, and some owners may not have determined the decoration time, the relevant main materials may be completed, and some owners are set up side decoration. In any case, it is important to make reasonable use of the main material to order and determine the delivery time.

Precautions for renovation

1. Do not pierce the walls of the load-bearing wall, remove the walls connecting the balconies and doors and windows, and enlarge the size of the original doors and windows or build additional windows and doors. This practice will cause partial cracks in the buildings and severely affect the anti-seismic capacity, thus shortening the service life of the buildings.

Second, the building floor should not be entirely paved with marble. Marble is dozens of times heavier than floor tiles and wooden floors. If the floor is entirely covered with marble, the floor may become overwhelmed. Especially in the second floor or above, the weight of the ground decoration materials must not exceed 40 kg/m2 because of the house decoration not identified by the housing safety appraisal station.

Third, the carpenter's package door covers and Mason's tiling are also to be matched. When wrapping the door cover, consider whether the following ground (either side of the door on either side of the door) should be tiled or other cement mortar leveling. Because the door covers are nailed to the floor if they are nailed before applying the tiles, if the cement and the door cover are stained when cement is used in the future, it will cause the door cover to be watery and moldy.

Fourth, bathroom waterproof is also a key link in the decoration. The general practice is, before decorating the toilet room, first stop the floor drain, put more than 5 cm of water, conduct the watering test, if it leaks, you must redo the waterproof; if you do not leak, you should also carefully lay the ground in the construction , Do not damage the waterproof layer and arbitrarily change the water and heating system. When determining the location of a bathroom floor drain, you must first think about it and measure the size. The floor drain is best located on one side of the brick. If it is in the middle of the brick, the floor drain will not be the lowest point regardless of how the brick is inclined.

5. During the construction, attention should be paid to avoiding holes, holes, hanging ceilings, and installing art lighting fixtures in the concrete circular hole plate.

6. Use copper wire when selecting wires and avoid using aluminum wires. Due to the poor electrical conductivity of the aluminum wire, the wire is prone to heat, the connector is loose, and even a fire is caused during use. In addition, during construction, attention should also be paid to the fact that it is not possible to dig trench-embedded wires directly on the wall, and regular bushings should be used to prevent leakage and fire.

Seventh, in the room decoration in order to pursue luxury, in the four walls covered with plates, ceilings inlaid with two or three-dimensional suspended ceiling, this decoration practice is not desirable. Because the four walls are covered with plates, occupying a larger space will reduce the area of ​​the entire space, the cost is also high, and it is not conducive to fire prevention. A low ceiling will create a sense of depression in the entire room.

8. Do not put the gas stove on the wooden floor cabinet in the kitchen decoration, nor can you wrap the gas valve in the wooden floor cabinet. Once the ground cabinet is on fire, the gas master valve will be difficult to close in the fire, and the consequences will be disastrous.

The above is the relevant content of the decoration process steps and decoration notices. I hope to help you. For more information on decoration, please continue to pay attention to the information on this site.

Renovation Steps Home Renovation Notes Yourself Renovation House Process Renovation Precautions House Renovation Precautions

SOLAR FLOOD LIGHT

Solar Security Light,Solar Powered Flood Lights,Solar Powered Security Lights,Solar Led Flood Lights

Wuxi Shengda Yukun Energy Development co.,Ltd , https://www.xlite-solarlight.com